Around 700 BC, the Assyrian Empire was taking the cities of Judah one by one. Jerusalem had a problem common to hilltop cities: its best water source, the Gihon Spring, sat low on the slope outside the main defenses. An army camped by the spring could drink while the city ran dry.

The Bible says King Hezekiah moved the water. "This same Hezekiah also stopped the upper spring of the waters of Gihon, and brought them straight down on the west side of David's city" (2 Chronicles 32:30). Another account mentions "the pool, and the conduit," and how he "brought water into the city" (2 Kings 20:20).

The conduit is still there. You can walk through it with a flashlight, in water up to your knees.

The numbers

The tunnel runs from the Gihon Spring to the Pool of Siloam. Measured along its winding path, it is about 533 meters long. Published figures range up to about 540 meters, depending on where the ends are taken. It follows an S-shaped curve, not a straight line.

The floor drops only about 30 centimeters from one end to the other, as commonly measured. That is a slope of about 0.06 percent. It is enough for water to flow, and the water has flowed for about 2,700 years.

The crews cut it by hand, with picks, through limestone bedrock.

The hard part: no shafts

The usual way to dig a long tunnel in the ancient world was to sink vertical shafts from the surface. Each shaft let crews check their position. They then cut short horizontal sections between the shafts and joined them.

Hezekiah's Tunnel has no intermediate shafts. Two crews started at opposite ends, one at the spring and one at the far end, and dug toward each other through the dark. The team that dated the tunnel calls it one of the longest ancient water tunnels built this way, and an engineering innovation for its time.

For comparison, the famous Tunnel of Eupalinos on the Greek island of Samos was also dug from both ends. It is longer, at 1,036 meters, and the American Society of Civil Engineers lists it as a historic landmark. It was finished around 520 BC. Hezekiah's Tunnel is more than a century older.

The workers left a note

In 1880, boys exploring near the southern end of the tunnel found writing cut into the wall. It is six lines of Hebrew in the old Hebrew alphabet. Scholars date the letter shapes and spelling to the late eighth century BC.

It does not name a king. It is about the moment the crews met. In plain English, it says this:

While the diggers were still swinging their picks toward each other, with three cubits left to cut, a voice was heard, each man calling to the other, because there was a gap in the rock. On the day they broke through, the diggers struck pick against pick, each toward the other. Then the water flowed from the spring to the pool, 1,200 cubits. The rock above the diggers' heads was 100 cubits high.

(This is our plain rendering. The first line is damaged, and one word, often read as a crack or gap, is still debated.)

Two details stand out.

The length checks out. A cubit was a forearm's length and varied by place and period. At the common cubit of about 44.5 centimeters, 1,200 cubits is about 534 meters. The measured tunnel is about 533. The figure may be a round number, and a different cubit would give a different answer. But the inscription's own measurement fits the tunnel.

It reads like an engineer's record. There is no prayer, no praise of the king, and no date. It records a distance, the depth of rock overhead, and the sound of voices through the stone. It was carved where few people would ever see it. Thieves cut it out of the wall around 1890 and broke it. It was recovered and taken to Istanbul, then the capital of the empire that ruled Jerusalem. It is in the Istanbul Archaeology Museums today.

Dating it with physics

For over a century, the date rested on two things: the Bible's account and the style of the letters in the inscription. One recent claim had put it much later, in the second century BC.

In 2003, Amos Frumkin of the Hebrew University, Aryeh Shimron of the Geological Survey of Israel, and Jeff Rosenbaum of the University of Reading published radiometric dates in Nature. They used two methods:

  1. Radiocarbon. The tunnel's plaster contains bits of plants that were alive when it was mixed. Accelerator mass spectrometry at Oxford put that plant material at roughly 800 to 510 BC.
  2. Uranium-thorium. Stalactites grew on the ceiling after the tunnel was cut. Their uranium-thorium ages are more than 2,300 years. So the tunnel cannot be from the second century BC.

Their summary: "the Biblical text presents an accurate historic record" of the tunnel's construction. They described it as the first radiometric dating of a structure mentioned in the Bible.

The dating does not settle everything. In 2011, the archaeologists Ronny Reich and Eli Shukron argued from new excavations near the spring that work may have started around 800 BC, before Hezekiah. Others defend Hezekiah's reign. The radiocarbon range is wide enough to cover both views.

How did they meet?

This question has been argued about for more than a century. The tunnel's winding path and the zigzags near the meeting point are the main clues. Three explanations get the most attention.

  • Following the rock. The geologist Dan Gill proposed that the crews followed a natural system of cracks and channels in the limestone. Water had already found a path, and the diggers enlarged it.
  • Signals from above. Shimron and Frumkin mapped the tunnel's geology. They report no continuous natural channel along the route, and say most fractures run across the tunnel's line, not along it. They suggest a third team on the surface hammered on the bedrock to give the diggers below something to aim for.
  • Managing the slope. Reich has argued that the long, curving route had more to do with keeping a gentle, even slope than with the rock itself.

There are also at least three false starts: short side cuts where a crew began in one direction and then gave up. Any full explanation has to account for those. What everyone agrees on is the ending. Near the middle, the two halves do not line up neatly. The cuts jog left and right as the crews adjusted toward each other's sounds, just as the inscription says.

What this does and does not show

It does show that a short, practical statement in the Bible, about a king, a pool, and a conduit, matches a real structure. It matches in location, function, and approximate date. The text could have failed that test, and it passed.

It does not show that every passage of the Bible is accurate, or that its claims about God are true. A Judean court record could get a water project right and still be wrong about other things. People who doubt the Bible are right to ask for evidence one claim at a time.

Our own view is that the claim that matters most is about Jesus of Nazareth: that He died, rose, and is the Son of God. That claim also has evidence you can weigh. The earliest accounts are the Gospels. You can read Matthew straight through in about an hour and a half, free at GotLuv.org, or search everything Jesus said by topic. When the first crowd in Jerusalem asked what to do about Him, Peter told them to repent and be baptized in the name of Jesus Christ for the forgiveness of sins (Acts 2:38). Our guide to becoming a Christian explains it.

Sources